As of Sep 2025, CLNG owns a fleet of 36 vessels (including 11 Arc7 LNG carriers) with 26 of which being put into operation. As a floating pipeline, they continuously deliver safe and stable transport service for our customers.
| Project | Vessel Name | Capacity | Yard | Delivery | Charterer | 
|---|---|---|---|---|---|
Guangdong LNG Project  |   Dapeng Sun |  147,210 | Hudong-Zhonghua Shipyard |   2008-04-03 | Guangdong Dapeng LNG |  
| Dapeng Moon |   2008-07-10 | ||||
| Dapeng Star |   2009-12-10 | ||||
| Fujian LNG Project |   Min Rong |   2009-02-24 | CNOOC-Fujian LNG |  ||
| Min Lu |   2009-08-13 | ||||
| Shanghai LNG Project |   Shen Hai |   2012-09-20 | Shanghai LNG |  ||
| PU Project |   Pan Asia |   174,000 | Hudong-Zhonghua Shipyard |   2017-10-13 | Shell | 
| Pan Americas |   2018-01-31 | ||||
| Pan Europe |   2018-07-10 | ||||
| Pan Africa |   2019-01-08 | ||||
| Yamal DSC Project |   Boris Vilkitsky | 172,410 | DSME |   2017-12-26 | Yamal Trade | 
| Fedor Litke | 2018-01-08 | ||||
| Georgiy Brusilov | 2018-12-10 | ||||
| Boris Davidov | 2019-01-18 | ||||
| Nikolay Zubov | 2019-02-22 | ||||
| Yamal TC Project |   Eduard Toll | 2018-01-12 | |||
| Rudolph Samoylovich | 2018-09-06 | ||||
| Nikolay Yevgenov | 2019-06-03 | ||||
| Vladimir Voronin | 2019-08-13 | ||||
| Georgiy Ushakov | 2019-11-06 | ||||
| Yakov Gakkel | 2019-12-04 | ||||
| Shenzhen Gas  Project  |   
 Dapeng Princess  |   79,916 | Hudong-Zhonghua Shipyard |   2023-02-16 | SINO-BENNY |  
| QE HZ Project | TBD | 174,000 | Hudong-Zhonghua Shipyard |   
 Before 2026-07-31  |   Qatargas | 
| QE HHI Project | TBD | 174,000 | HHI | 
 Before 2026-12-16  |   Qatargas | 
LNGS MAIN PARTICULARS:
| Specifications | 
  Guangdong/Fujian/Shanghai Project | 
  PU Project | 
  Yamal Project (Arc7) | 
 
|---|---|---|---|
| Length Overall | 
  292M | 290M | 299M | 
| Breadth(Moulded) | 
  43.35M | 46.95M | 50M | 
| Depth(Moulded at side at main deck) | 
  26.25M | 26.25M | 26.5M | 
| Design Draught (Moulded) | 
  11.43M | 11.50M | 11.755M | 
| Scantling Draught (Moulded) | 
  12.33M | 12.50M | 13.00M | 
| Cargo Tank Type x Quantity | 
  GTT No.96 x 4 Tanks | GTT NO.96 x 4 Tanks | GTT NO.96-GW x 4 Tanks | 
| Deadweight | 
  68,938 T | 80,480 T | 79,880 T | 
| Cargo Tanks | 
  147,236 M3 | 174,000 M3 | 172,410 M3 | 
| Main Steam Turbine MCR x RPM | 
  27,300 KW x 83 RPM | 23,400 KW x 69.1 RPM | 39,600 KW x 108 RPM | 
| Propulsion | 
  Duel fuel steam engine propulsion | TFDE electric propulsion | DFDE+Azipod electric propulsion | 
| Design Service Speed | 
  19.5 Kn with 27% Sea Margin | 19.5 Kn with 20% Sea Margin | 19.5 Kn with 21% Sea Margin | 
| Boil-off Gas Rate | 
  ≤0.150%/Day | ≤0.145%/Day | ≤0.130%/Day | 
| Specifications | 
  Shenzhen Gas Project | QE HZ Project | QE HHI Project | 
|---|---|---|---|
| Length Overall | 
  239M | 299M | 299M | 
| Breadth(Moulded) | 
  36.6M | 46.40M | 46.40M | 
| Depth(Moulded at side at main deck) | 
  21.0M | 26.25M | 26.5M | 
| Design Draught (Moulded) | 
  8.50M | 11.50M | 11.50M | 
| Scantling Draught (Moulded) | 
  9.50M | 12.50M | 12.50M | 
| Cargo Tank Type x Quantity | 
  
GTT NO.96-L03+ x 4 Tanks  | 
  
GTT NO.96-L03+ x 4 Tanks  | 
  
GTT Mark III Flex x 4 Tanks  | 
 
| Deadweight | 
  37,200 T | 80,280 T | 80,939 T | 
| Cargo Tanks | 
  79,916 M3 | 174,000 M3 | 174,000 M3 | 
| 
 Main Steam Turbine MCR x RPM 
 | 
  13,400 KW x 115.4 RPM | 24,680 KW x 75.0 RPM | 24,100 KW x 74.7 RPM | 
| Propulsion | 
  Duel fuel diesel engine propulsion | Duel fuel diesel engine propulsion | Duel fuel diesel engine propulsion | 
| Design Service Speed | 
  17.5 Kn with 15% Sea Margin | 19.5 Kn with 21% Sea Margin | 19.5 Kn with 21% Sea Margin | 
| Boil-off Gas Rate | 
  ≤0.140%/Day | ≤0.098%/Day | ≤0.085%/Day |